• (+44)7307 863 846
  • info@gcelab.com
Dec
31

Pedestrian Guardrail Design and Standard Details: 5 Important Points

Table of Contents What is Pedestrian Guardrail? What is the purpose of Pedestrian Guardrail? Types of Pedestrian Guardrail? Component of Pedestrian Guardrails Standard Finishing of Pedestrian Guardrails: You must have seen pedestrian guardrails along urban footways, but do yo...

Read More
Dec
28

Design of Railway Track or P-way? 4 Important Points

Table of Contents Opportunities in the Railway Industry? Elements of Railway Track Design: Horizontal Alignment Design Vertical Alignment Design Superelevation Unbalance How to define Railway Track Speed at Curves? Safe Speed: Overturning Speed: Signal Speed: Maximum Au...

Read More
Dec
23
What is Substation

What is Substation & how does Substation work? 6 Important Points

Table of Contents What is Substation? Function of Substation Stepping up and down the voltage: Switching: Power Cuts: Protection System: Types of Substation  Transmission substations Distribution Substations Traction Power Substation for Railway or Pway: Distrib...

Read More
Dec
19
as built drawing

What are As-Built Drawings in Construction? 6 Important Points

Table of Contents What does As-Built stand for? Who Creates As-Built Drawings? When As-Built drawings are started? Why As-Built drawings are so important? What is Included in As-Built Drawings? Key Takeaways: As-Built Drawings come into the picture at the end of any construc...

Read More
Dec
17

What is Change Order in Construction Contract? 4 Important Points

Table of Contents What is a Change Order? What to be included in Change Order? Dates of the Change Order Details to include in the Change Order Mini Project Programme and Schedule of Deliverables The fee of the Change Order When Change Orders are Raised? Inadequate Scope of W...

Read More
Dec
11

What is RFI in Construction Stage? 5 Important Points

Table of Contents What is RFI in Construction? Why RFI is so Important? Who are the Key Stakeholders of RFI Process? What is the process to raise RFI? Raise RFI at the Earliest: Thoroughly Prepare the RFI Request for the RFI response in a fixed time frame RFI Template Prop...

Read More
Dec
06

Road Lighting Design and Design Software’s - 8 Important Points

Table of Contents Why Road Lighting is Required? Key Factor to consider for Street Lighting Design Uniform Illumination Limit the Glare Adequate Contrast Sensitivity Key Steps of Road Lighting Design: Illumination Levels Angle of Luminaire Constraints of the high-speed roa...

Read More
Dec
03
railway sleepers

Purpose of Railway Sleepers and Their Types? 3 Important Points

Table of Contents Types of Railway Sleepers: Wooden Sleepers: Steel Sleepers: Slab Track: Concrete Slab Track  Some Key Advantages of Slab Track Systems: What is the purpose of Railway Sleepers, how do they perform, and what are the advantages? If you are curious abou...

Read More
Nov
28

What is Health and Safety Signs for Construction Site? 3 Important Points

Table of Contents What are those Health and Safety Signs?  Type of Health and Safety Signs Warning Signs: Mandatory Signs: Prohibition Signs: Safe Condition Signs: Fire Equipment Signs: How Safety Signs are categorised with Colour of the Sign Panels? Red Colour Circul...

Read More
Categories
Recent Posts

GCE CV Builder

GCE CV Builder

Archives